Barratt EC, Essex - Catfoss Hire

Case Studies - Barratt EC, Essex

Barratt EC, Essex


Project Description

Barratt Homes required cabins for their site accommodation whilst undertaking the building of new 300 houses. The cabins were used for welfare facilities and included office space.

Number of Cabins 15
Setup Double stacked
Cabin Size 32’ x 10’ plus 21 x 9 steel stores
Cabin Use Office / welfare for the building of 300 houses
Client Reference A job well done and on time as promised.” – Operations Director.

Back to Projects