Greater Manchester Police required a new training facility. An open plan classroom area and training room were required and needed to be installed within a quick timescale. Space restrictions resulted in a two storey building being used. Both floors have open plan layouts, which have been tailored to meet the clients specifications and requirements. The building is hired giving Greater Manchester police a flexible short to medium term solution.
- Size – 115 sqm
- Scope of Works –
- Detailed design
- Bespoke refurbishment
- Delivery and installation
- Timescales – 10 weeks
- Build Method – Recycled steel frame modular construction